Tender Preparation

Breathing Air Compressor Pre-Tender Checklist

A vague specification invites non-compliant bids and post-award challenges. These are the 11 areas a defensible breathing air tender needs to lock down. Tick each item as your specification covers it, or print the list for your tender file.

1

Compressor Technical Specifications

The heart of the bid package. A vague specification invites bids that cannot be compared.

2

Air Quality & Purity Standards

The most commonly missed section, and the one that matters most for the people breathing the air.

3

Air Intake & Compressor Room

Where the air comes from decides what goes into every cylinder. The intake, its protection from cold and moisture, and the room's heating, cooling and ventilation work together. Under normal use a weakness in any of them may never show. When the system is working hardest, such as after a long fire, it can, and that is the worst time to learn the room was not designed for it. We suggest the tender ask for an engineered review of the intake and the room, signed off by a professional engineer, as a separate price on the bid form. The review then becomes part of the price rather than a separate cost to the department, and every bidder prices the same work.

4

Compliance & Certification Requirements

Missing certification requirements are a common reason for a challenge after the contract is awarded.

5

Electrical Supply, Isolation & Lockout

Your department owns its lockout program. The tender decides whether the equipment makes that program possible. Many existing compressors are wired in directly with none of the items below in place, so do not assume your current installation has them.

6

Fill Station & Containment

The fill station is where your members stand next to high pressure. Specify it as carefully as the compressor.

7

Storage, Cascade & Piping

Storage lets you refill SCBA quickly after a fire. It is often priced as an afterthought, so spell it out.

8

Installation & Site Requirements

Clear site requirements prevent installation delays and cost overruns.

9

Commissioning & Training

Commissioning proves the system works as specified. Training makes sure the people using it know how.

10

Maintenance, Warranty & Support

The purchase price is only part of the cost. Service terms decide whether the compressor is ready when you need it.

11

Bid Submission & Payment

Clear submission and payment terms protect your department and make bids comparable.